Four steps, and you always know which one you are in.

Most renovation stress is not about carpentry. It is about not knowing what happens next week. This is exactly how every Greystone job runs, from the first phone call to the warranty.

01
45–90 minutes, no charge

Site visit

Consultation

We walk every room in scope with you, measure, photograph, and open access panels where we can.

You will hear what is possible, what is not, and roughly what each option costs before we leave.

Bring the list of things that bother you. That list is more useful to us than a Pinterest board.

What you get
Measured notes and photos of existing conditions
A verbal budget range the same day
Notes on permits, structure and access constraints
02
Within 5 business days, free

Written estimate

Estimation

Line-item scope, materials named by brand and model, allowances stated in dollars rather than hidden.

Real start and finish dates, based on our actual booked schedule, not a hopeful one.

A payment schedule tied to stages of work, and the WorkSafeNB and liability certificates attached.

What you get
Line-item price with named allowances
Start and finish dates, plus the payment schedule
Insurance and WorkSafeNB certificates attached
03
The dates in your estimate

Build

Réalisation

One lead carpenter owns your job from demo to trim, and you have his mobile number.

Dust walls up before demo, site swept daily, and a Friday photo update by text or email.

Any surprise gets a photo, a call and a written change order before another hour is worked.

What you get
One named lead carpenter throughout
Friday photo update, every week
Written change orders — never a surprise invoice
04
Within 5 days of finishing

Walkthrough

Livraison

We walk the job together and write the deficiency list on one sheet, in your words.

Everything on it is cleared inside a week unless a part has to be ordered — and then you get the date.

Then a two-year workmanship warranty, plus manufacturer coverage registered in your name.

What you get
Deficiency list written together, cleared in a week
Two-year workmanship warranty in writing
Manufacturer warranties registered to you
Typical durations

How long things actually take here.

Kitchens3–5 weeks
Bathrooms2–3 weeks
Basements4–6 weeks
Roofing & siding1–3 weeks
Additions8–12 weeks
Commercial fit-outs4–10 weeks

These are calendar weeks on site, not optimistic ones. Winter roofing and spring excavation are weather-dependent, and we say so in the estimate rather than after.